La linea ferroviaria ad alta velocità HS2 arriverà a Londra Euston, segnala il ministro dei trasporti

https://www.standard.co.uk/news/politics/hs2-high-speed-rail-line-will-run-to-euston-transport-secretary-louise-haigh-confirms-b1186492.html

di Codydoc4

12 Comments

  1. TheShakyHandsMan on

    So they signalled that it will be going ahead. 

    Will they tell us it’s on track when construction is underway. 

  2. Poop_Scissors on

    Thank fuck for that. At least now it’s only a huge disappointment rather than completely pointless.

  3. BobMonkhaus on

    In unrelated news a town in Warwickshire has been renamed to London Euston.

  4. Harrry-Otter on

    Without the northern portion of HS2 it still feels very much like a half measure, although going to Euston does make sense.

  5. Express-Doughnut-562 on

    Good to hear that we’ve progressed from a railway that runs from where people aren’t to where they don’t want to a railway that still takes people from where they aren’t, but at least now takes them roughly where they *do* want to be.

  6. mashed666 on

    We should have built it in full… Then extended it to the south up to Scotland and all of Wales. We’re getting on for 200 years on the railways… I think any investment then has been fully paid back by now…. We’re not building it for now we’re building it for 100years time….

    To many people looking at the short term savings with this…

  7. EdmundTheInsulter on

    More London centrism to go with the promotions of London MPs

  8. Innocuouscompany on

    Those huge billboards can still be used for adverts just more scenic ones. They should have soothing views of the UK on there and advertisers get their logos in the corner or a banner at the bottom.

  9. Glad HS2 is likely headed to Euston, now can we get it to Crewe at the minimum

  10. Key_Effective_9664 on

    The funny thing is the other end there is no planned connection between Birmingham Curzon street terminus and the 3 Birmingham rail stations, some of which are 1.5km away.

    Or the Birmingham interchange and the airport, which is even further. They are planning on just having busses, lol

    So actually the existing rail link could still be faster in real world conditions. It’s a complete waste of time 

  11. As good as this decision is… the bigger one is about up to Crewe… That section was the more important one as that then helps with the congestion on the WCML…. which was one of the main points of HS2 in the first place

Leave A Reply